期刊文献+

三峡工程导流底孔布置及方案比较水力学研究 被引量:4

Hydraulics Study on Arrangement and Scheme Comparison of Diversion Bottom Outlets for TGP
下载PDF
导出
摘要 三峡工程导流底孔承担三期导、截流和围堰发电期泄洪任务,水头高、流量大、运行条件复杂,为国内外导流工程罕见。并且关系到工程施工安全和工期。本文概述了底孔布置、体型和运行条件等方面的水力学研究,以及底孔长、短有压段两个方案进行的比较研究和优化成果。 With their major functions of river diversion and closure in the 3rd construction phase and releasing flood in the initial cofferdam supported generation period, the diversion bottom outlets of the TGP are hardly seen in the world for their high water head, huge discharges and complex operation conditions. A lot of hydraulics model tests have been conducted in the past decade. This paper presents briefly the study results on their arrangements, configurations and operation conditions. Two major schemes, i.e. long pressure conduit and short pressure conduit, are compared and optimized in viewpoint of hydraulics.
出处 《长江科学院院报》 CSCD 北大核心 1997年第4期41-46,共6页 Journal of Changjiang River Scientific Research Institute
基金 国家"八五"攻关子题三峡大坝单项技术设计项目
关键词 三峡工程 导流底孔 水力学 TGP diversion bottom outlet long pressure conduit short pressure conduit
  • 相关文献

参考文献2

二级参考文献1

  • 1许协庆,欧阳兰薰.管道中沿圆弧形边界的压力分布和初生空穴数[J]水利学报,1963(04).

共引文献1

同被引文献16

引证文献4

二级引证文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部