摘要
重点从应用网络GPS-RTK测量布设控制以及应用拟合方法求取最低弧垂点两方面探讨高压走廊的竣工测量方法。
This article discusses the method on the finish construction of high Tension COrridor from two aspects: surveying control point by Network GPS-RTK technology and calculating the Lowest Hanging Point of High Voltage Transmission Cables by curce fitting.
出处
《地理空间信息》
2008年第3期110-112,共3页
Geospatial Information
关键词
竣工测量
网络GPS—RTK
高压走廊
悬链线方程
finish construction survey
network GPS-RTK
high tension corriow
catenary's curce equation