浅埋大跨隧道掘进中爆破振动控制与监测 被引量:7

Control and monitoring for blasting vibration during excavation of the shallow and long span tunnel
下载PDF
导出
摘要 文章介绍了在重庆双山隧道开挖爆破施工过程中,为控制爆破振动对山顶建筑物影响,隧道开挖采取了减小单段最大装药量,增设周边减震孔,以及选用合适的爆破器材等措施来控制爆破振动,并在施工过程中,对双山山顶建筑进行设点监测振动,对监测结果进行了分析。结果表明,在隧道掘进过程中对爆破振动控制所采取的措施是成功的,利用传统的经验预测公式保守估算单段最大用药量运用在该工程上可行,振动对测点周围的房屋影响不大,说明对爆破震动所采取的控制技术是成功的,结论为今后类似工程具有借鉴意义。 The blasting vibration in the course of Shuangshan tunnel excavation in Chongqing is introduced, in order to control the impact of blasting vibration for mountaintop building. Various measures, such as cutting down the biggest pack amount of explosive in single segment, increasing the bore quantity for reducing the earthquake wave and choosing the suitable device and instrument are adopted. During the construction, a lot of blasting vibration monitoring points are laid at the top of Shuangshan. The obtained monitoring data shows that the vibration influence on the houses at the top of Shuangshan is very light, so the control technologies of blasting vibration are applied successfully, and the control technique will be a model to the following similar projects.
出处 《中国地质灾害与防治学报》 CSCD 2008年第2期44-48,共5页 The Chinese Journal of Geological Hazard and Control
基金 教育部"新世纪优秀人才支持计划"(NCET-05-0763)
关键词 大跨隧道 光面爆破 控制技术 振动监测 浅埋 重庆双山隧道 long span tunnel smooth blasting control technology vibration monitoring shallow Shuangshan Tunnel,Chongqing City
  • 相关文献

参考文献9

  • 1汪旭光,于亚伦,等.爆破安全规程实施手册[M].北京:人民交通出版社,2003.
  • 2陆道儿.浅埋深大断面地下工程爆破振动速度监测[J].煤炭工程师,1996(5):43-44. 被引量:2
  • 3铁道第二勘察设计院.双山隧道施工设计图[R].2005.
  • 4朱泽兵,张东明.大坪隧道掘进中爆破震动的控制[J].工程爆破,2002,8(4):67-70. 被引量:5
  • 5LS-DYNA User' s Manual: Nonlinear dynamic analysis of structures in Three Dimensions [ R ]. Livermore Software Technology Corporation. 1997.
  • 6G Bhattacharya, D Jana, S Ojha, S Chakraborty, Direct search for minimum reliability index of earth slopes [ J ]. Computers and Geotechnics,2003,30: 455- 462.
  • 7L Siad. Seismic stability analysis of fractured rock slopes by yield design theory [J]. Soil Dynamics and Earthquake Engineering, 2003,23:203 - 212.
  • 8T Shiotani. Evaluation of long-term stability for rock slope by means of acoustic emission technique [ J ]. NDT&E International, 2006,39 : 217 - 228.
  • 9陈昌富,杨宇,龚晓南.基于遗传算法地震荷载作用下边坡稳定性分析水平条分法[J].岩石力学与工程学报,2003,22(11):1919-1923. 被引量:27

二级参考文献13

  • 1.中华人民共和国行业标准.水工建筑物抗震设计规范(SL203-97)[S].北京:中国水利水电出版社,1997..
  • 2Lo S C, Xu D W. A strain-based design method for the collapse limit state of reinforced soil walls or slopes[J]. Can Geotech J, 1992,29(5): 832-842.
  • 3Shahgholi M, Fakher A, Jones C J F P. Horizontal slice method of analysis[J].Gétechnique, 2001, 51(10): 881-885.
  • 4Fan K, Fredlund D G, Wilson G W. An interslice force function for limit equilibrium slope stability analysis[J]. Can Geotech J, 1986,23(1): 287-296.
  • 5Morgenstern N R, Price V R. The analysis of the stability of general slip surface[J]. Gétechnique, 1965, 15(1): 79-93.
  • 6Goh A T C. Genetic algorithm search for critical slip surface in multiple-wedge stability analysis[J]. Can Geotech J, 1999, 36(2):382-391.
  • 7重庆交科公路勘察设计院.重庆轻轨较新线佛-大区间隧道和车站隧道施工设计图[Z],2001.
  • 8地下铁道工程施工及验收规范(GB50229-99)[M].北京:中国计划出版社,1999.
  • 9[美]汤姆逊(W·T· Thomson) 编著,胡宗武等.振动理论及其应用[M]煤炭工业出版社,1980.
  • 10肖专文,张奇志,梁力,林韵梅.遗传进化算法在边坡稳定性分析中的应用[J].岩土工程学报,1998,20(1):44-46. 被引量:128

共引文献31

同被引文献89

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部