期刊文献+

高性能动力系统的技术进展与应用

Technique Development and Application of High Performance Power Systems
下载PDF
导出
摘要 在能源紧张和环保压力增大的形势下,开展对高性能动力系统(HIPPS)的研究和实践具有较大的经济和社会意义。HIPPS是一种新型燃煤发电技术,具有效率高、污染小、成本低等优势。回顾了HIPPS的发展历程、技术目标和设计原理,综合阐述了按照不同技术路线设计的两种HIPPS具体的技术方案(UTRC、FWDC),并对二者进行了比较评价,在此基础上,重点研讨了对常规燃煤电站进行HIPPS改造的技术方案及市场竞争优势。是进一步研究HIPPS的基础工作。 High Performance Power Systems (HIPPS), which is a new technique of generate electricity of burning coal,has the advantage of lower investment,less emission and significantly higher thermal efficient. This paper describes the development.technique target and two projects of HIPPS. On the other hand, HIPPS also can do technological transformation to the routine power station. There are also some advantages when compete to the other modern technique of generate electricity.
出处 《电力学报》 2008年第2期94-97,共4页 Journal of Electric Power
关键词 高性能动力系统 高温空气加热炉 联合循环 HIPPS HITAF combined cycle
  • 相关文献

参考文献8

  • 1陈宏,纪爱建,肖立川,刘强.低污染锅炉系统的应用与发展[J].电力学报,2007,22(1):24-27. 被引量:1
  • 2Ruth L A. The U. S Department of Energy Combustion 2000 Program: Clean,Efficient, Electricity from Coal[J]. Energy Convers Mgmt,1997,38(10-13) :1249-1257.
  • 3蔡本虎.一种高性能的燃煤联合循环系统[J].燃气轮机技术,1994,7(1):79-80. 被引量:3
  • 4肖立川,陈宏,薛国新.美国燃煤电厂的技术进展[J].江苏工业学院学报,2005,17(3):60-64. 被引量:5
  • 5United Technologies Research Center. Combustion 2000 Phase Ⅱ[R]. Quarterly Progress Report,1999;1-3.
  • 6Foster Wheeler Development Corporation. Development of a High-performance Coal-fired Power Generating Systems with Paralysis Gas and Char-fired High Temperature Furnace (HITSF) [R]. Quarterly Progress Report, 1994:9-11.
  • 7John Ruby,Robson F L, et al. High Performance Power Systems (HIPPS)-Opportunities and Options for the Coal-Fired Power Plant Market[J]. Energy Convers Mgmt, 1997,38(10) : 1275-1282.
  • 8United Technologies Research Center. Engineering Development of Coal-Fired High Performance Power Systems Phase Ⅱ and Ⅲ [R]. Quarterly Progress Report,1999:4-6.

二级参考文献17

  • 1蔡本虎.一种高性能的燃煤联合循环系统[J].燃气轮机技术,1994,7(1):79-80. 被引量:3
  • 2US DOE.Energy Information Administration[A].Annual Energy Review[R].Washington:US DOE,1998.
  • 3Robert A Lisauskas.Low-NO x Slagging Combustion for a Low Emission Boiler System[A].Evolution of Combustion Technology to Support National Energy Needs[C].Orlando:Babcock Borsig Power,Inc,Sheraton World Resort,2002.
  • 4Beittel R,Darguzas J N,Ruth L A.LEBS Plant Leaves the Drawing Board[J].Power Engineering,1998,102(4):31-36.
  • 5Wu S F,Mckinseyz R.Performance Prediction of a Repowering Application Derived from a High-Performance Power System(HIPPS)[J].Energy Convers Mgmt,1997,38(10):1 275-1 282.
  • 6Tidd.Hot Gas Clean Up Program-Final Report[R].Columbus:American Electric Power Service Corporation,1995.
  • 7Sera T,Inoue K,Tatani A,et al.Development of Fixed Bed Type Hot Gas Clean-Up Unit for Coal Gasified Gas[J].Mitsubishi Heavy Indust Tech Rev,1996,33(1):14.
  • 8Zheng Ligang,Furinsky Edward.Comparison of Shell,Texaco,BGL and KRW Gasifiers as Part of IGCC Plant Computer Simulations[J].Energy Conversion and Management,2005,(46):1 767-1 779.
  • 9LA Ruth.The US Department of Energy's Combustion 2000 Program:Clean,Efficient Electricity From Coal[J].Energy Convers Manage,1997,38(10-13):1249-1257.
  • 10Office Of Fossil Energy.Clean coal today.US Department Of Energy.DOE/FE-0215P-53 Issue NO.53,Spring 2003.

共引文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部