摘要 太原第二热电厂阳坡灰场自2004年投入运行以来,发现坝体裂缝较多,坝肩透水较为严重,为了确保灰场安全运行,需进行分析评价。灰场及随着贮灰面升高以及后期三级子坝加高后,灰坝坝体及南北坝肩的安全特性进行了测查,结合原型观测资料、工程地质勘探和室内试验成果对现状坝体以及南坝肩变形和渗流进行了反分析,确定了土体计算参数,然后在对初期坝和灰坝加高后坝体、南坝肩进行有限元静动力分析、渗流分析和稳定分析的基础上,对坝体和南坝肩的安全性进行了评价,并提出了相应的工程治理措施,研究方案对类似工程项目具有一定的指导意义。 From bringing into service of Yangpo ash field of Datang Taiyuan No. 2 Thermal Power Plant in 2004,it is found that there are a lot of fractures in dam body and it is serious to filter in dam abutment. Combining prototype measurement data with the results of engineering geological prospecting and indoor soil test ,the feedback analysis is proceeded for the deformation and seepage flow of present dam body and dam abutment. On the basis of the above analysis, the soil computation parameters are determined. Then based on the FEM static-dynamic analysis, seepage flow analysis and stability analysis of preliminary dam and terminal dam, it is carried through safety evaluation for dam body and south dam abutment. Finally corresponding project treating measurements which may have some guide meanings for analogous project are put forward.
出处 《电力学报》 2008年第2期101-105,共5页 Journal of Electric Power
基金 大唐集团公司科研立项项目(2006-04-012)
关键词 灰场 裂缝 透水 数值模拟 反馈分析 ash field, fracture filter numerical modeling feedback analysis
  • 相关文献

参考文献6

  • 1中华人民共和国电力部.DL/T5045-95火力发电厂灰渣筑坝设计技术规定[S].北京:中国电力出版社,1995.
  • 2中华人民共和国水电部.SL203-97水工建筑物抗震设计规范[S].北京:中国水力出版社,1997.
  • 3沈珠江.土石料的流变模型及其应用[J].水利水运科学研究,1994(4):335-342. 被引量:66
  • 4李国英,米占宽,等.太原第二热电厂阳坡灰场灰坝坝体以及坝肩动力稳定分析,成果编号:土0237[R].南京水利科学研究院,2002.
  • 5牛运光.土石坝裂缝原因分析与防治处理措施综述[J].大坝与安全,2006,20(5):61-66. 被引量:15
  • 6中华人民共和国国家标准编写组.GB50330-2002建筑边坡工程技术规范[S].北京:中国建筑工业出版社,2002.

二级参考文献1

共引文献89

同被引文献8

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部