摘要
分析了岭澳一期核电站"常规岛及BOP部分"全开全关电动门逻辑图设计存在的问题。在岭澳二期设计过程中,结合本期工程的设计原则,提出了逻辑图标准化设计的解决方案,使设计效率大大提高。
This paper analysed the problems in designing logic diagrams of ON/OFF motorised valves of Lingao phase I nuclear power station CI and BOP part. During the designing process of Lingao phase Ⅱ, the efficiency has been increased through a resolution of typical designing according to the designing principle of Lingao phase Ⅱ.
出处
《电力科学与工程》
2008年第4期65-67,71,共4页
Electric Power Science and Engineering