上海长江隧道工程穿越长江河口,工程施工面临诸多技术难关。分析评价了所在区域的水文与岩土地质特征,阐述了工程施工特点及地面沉降控制技术。
Shanghai tunnel engineering crosses Estuarine of the Yangtze River. Its geological condition have harmful effects for construction. It analyted and evaluated hydrology and geotechnical geological characteristic and expatiated engineering construction trait and control technology of land subsidence.