摘要
对上海崇明越江隧道工程沿线的工程地质和水文地质条件进行概略总结,并对场地内的不良地质及其对策进行了分析评价。
The paper summarizes the engineering geologic and hydrogeologic condition along the Shanghai Chongruing Tunnel and analyses the unfavorable geological condition and its solution in the site.
关键词
崇明隧道
岩土工程
不良地质
Chongming Tunnel, geotechnical engineering, unfavorable geological condition