摘要
结合工程项目实际,基于完成跨座式单轨交通方式信号系统所需要的车辆的出清和占用状态,通过对目前有可能使用的几种方案进行比对,对计轴设备在重庆单轨交通三号线信号系统中的应用方案研究进行了介绍。
To introduce the study on application scheme of axle counter in signal system of Chongqing monorail traffic line 3 based on the fact of the project, the train occupying and releasing state needed by the signal system in the monorail traffic, and comparison between several schemes possibly used at present.
出处
《铁路通信信号工程技术》
2008年第3期22-24,27,共4页
Railway Signalling & Communication Engineering
关键词
计轴设备
重庆单轨
信号系统
应用方案
Axle counter, Chongqing monorail traffic, Signal system, and Application scheme