考虑学习效应的复杂工程网络优化及仿真 被引量:1

Task Flow Optimization and Risk Simulation Model of Complex Construction Proje
下载PDF
导出
摘要 为了有效管理和控制复杂工程项目的成本和进度,文章提出了一种项目网络流程优化算法。该优化算法以设计结构矩阵为基本分析工具,通过重新安排任务的执行顺序,降低项目执行过程中的返工迭代来优化整个项目的工期和费用。考虑到项目执行过程中部分任务需要返工多次才能满足要求,着重考虑了学习效用对于项目时间和费用的影响。算例仿真结果表明,项目中的学习效应会对成本和进度产生显著影响,对于任务之间存在具有高度耦合关系的复杂工程项目,该优化算法可以有效地降低项目执行成本和执行费用。 In order to effectively manage the schedule and cost of complex construction projects, an algorithm is developed to optimize task flows. This algorithms uses Design Structuring Matrix as the basic analysis tool, and optimizes the task flow through reorganizing the tasks execution sequence. As learning curve will play an important role in the completion of complex project, this paper also takes this factor into consideration. The simulation results in the case study indicates that it is quite effective for projects with high task interactions, and the learning curve will pose a significant effect upon project cost and schedule.
出处 《北京航空航天大学学报(社会科学版)》 CSSCI 2008年第2期8-12,共5页 Journal of Beijing University of Aeronautics and Astronautics:Social Sciences edition Edition
基金 优博基金(200466) 香港城市大学基金(6000114)
关键词 复杂工程 学习曲线 优化 complex projects learning curve optimization
  • 相关文献

参考文献8

  • 1[2]Steward D V.The Design Structure System:A Method for Managing the Design of Complex Systems[J].IEEE Transactions on Engineering Management,1981,28:71-74.
  • 2[3]Eppinger S D,Whitney D,Smith R P.A Model Based Method for Organizing Tasks in Product Development[J].Research in Engineering Design,1994,6:1-13.
  • 3[4]Browning T R,Eppinger S D.Modeling Impacts of Process Architecture on Cost and Schedule Risk in Product Development[J].IEEE Transactions on Engineering Management,2002,49(4):428-443.
  • 4[5]Ali Yassine D B.Complex Concurrent Engineering and the Design Structure Matrix Method[J].Concurrent Engineering:Research and Applications,2003,11(3):165-177.
  • 5[6]Abdelsalam H M E.Optimization Based Architecture for Managing Complex Integrated Product Development Project[D].Norfolk:Dominion University,2003:69-108.
  • 6[7]Li L,Shi-Jie C.Decomposition of Interdependent Task Group for Concurrent Engineering[J].Computer and Industrial Engineering,2003,44:435-459.
  • 7[8]Zhang H P,Qiu W H.An Approach to Measuring Coupled Tasks Strength and Sequencing of Coupled Tasks in New Product Development[J].Concurrent Engineering:Research and Applicatian,2006,14(4).
  • 8[9]Cho S H,Eppinger S D.Product Development Process Modeling Using Advanced Simulation[A].Proceedings of DETC'01 ASME 2001 Design Engineering Technical Conferences and Computers and Information in Engineering Conference[C].Pittsburgh:Pennsylvania State University,2001.1-10.

同被引文献6

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部