期刊文献+

Construction of 600 kt/a PTA Unit Kicked off in jiangyin

Construction of 600 kt/a PTA Unit Kicked off in jiangyin
下载PDF
导出
摘要 In November 2007 the construction of 600 kt/a PTA unit was kicked off at Hanbang (Jiangyin) Petrochemical Co., Ltd. The investment for this unit totals around 2.77 billion RMB, and In November 2007 the construction of 600 kt/a PTA unit was kicked off at Hanbang (Jiangyin) Petrochemical Co., Ltd. The investment for this unit totals around 2.77 billion RMB, and is constructed jointly by Jiangyin Chengxin Industry Co., Ltd.and Hong Kong Hanbang Petrochemical Co., Ltd. by applying the PTA proprietary technology licensed by the American Invista Company.
出处 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2008年第1期33-33,共1页 中国炼油与石油化工(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部