期刊文献+

China’s Ethylene Production Capacity to Reach 18 Mt/a by 2010

China’s Ethylene Production Capacity to Reach 18 Mt/a by 2010
下载PDF
导出
摘要 On December 18, 2007 the construction of 800-kt/a ethylene project was kicked off in the Hongshan district of Wuhan city. This project will be set up according to the concepts of forming an integrated project to connect the upstream units with the downstream ones while being supported by oil refin- On December 18, 2007 the construction of 800-kt/a ethylene project was kicked off in the Hongshan district of Wuhan city. This project will be set up according to the concepts of forming an integrated project to connect the upstream units with the downstream ones while being supported by oil refining facilities of the SINOPEC Wuhan Branch Company.
出处 《China Petroleum Processing & Petrochemical Technology》 SCIE CAS 2008年第1期48-48,共1页 中国炼油与石油化工(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部