期刊文献+

黄河滩地开采地下水工程等水位线的计算及其环境影响

THE YELLOW RIVER BEACH EXTRACT UNDERGROUND WATER ENGINEERING CONTOUR WATER CALCULATE AND ENVIRONMENT EFFECT
下载PDF
导出
摘要 位于郑州市北郊黄河95滩地的地下水源工程共钻井46眼,日开采水量100000m3。本文以区域地下水流方程模拟计算开采条件下的地下水位降深及等水位线,分析了工程对区域环境的影响,预测降深超过8m的83m等水位线范围大于22km2。在此区域内,约有381眼农用机井将吊泵,失去抽水能力,年抽水量约4610000m3。 The Yellow river beach underground water engineering is situated in the north suburban of Zheng Zhou, it will drilling 46 wells. Drilling extract water 100000m 3. The paper take localized area underground water engineering analogue calculate extract condition and underground contour water line would be dropping, analyse engineering given the district environment effect. Forecast contour water will be subsidence 8m to 83m, it gone beyound bounds contour water line over 22km 2. In the district about 381 agricultural wells drilling water will be losing. In the year drilling water about 4610000m 3.
出处 《河南科学》 1997年第4期476-481,共6页 Henan Science
关键词 黄河 等水位线 环境影响 地下水工程 Yellow river, Underground water, Underground water flower equation, Equal water level line, Environment effect
  • 相关文献

参考文献1

  • 1德金七博(KinelbachW·) 著杨汝均等 编纂水环境数学模型[M].

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部