摘要
在火力发电厂建设过程中,有建设管理方(业主或业主委托的职业建设管理单位)、施工单位、调试单位等。不同的参建单位,编制工程进度的依据与范围都会不同,进度计划的详细程度、范围和级别等各方面也会有所不同,其中建设管理单位的总进度计划起着纲领性的作用。本文探讨如何运用P3软件编制出一个完善的火电工程实施阶段工程的总进度计划。
In the period of the construction process of a fossil-fuel power plant project,there are many companies joining it,such as construction manager company (owner or professional construction manager company authorized by owner),erection company ,testing company ,etc. For different companies ,the basis and the scope of the schedule are different. There are differences of the construction schedule in the detail, in the scope, in the level and in the other sides. The overall schedule chart of the construction manger is the most important leading plan of a project. Here well give a sample and a businesslike method to show how the construction manager uses the primavera project planner software to make a perfect overall schedule chart for a fossil-fuel power plant project.
出处
《制冷空调与电力机械》
2008年第3期94-99,共6页
Refrigeration Air Conditioning & Electric Power Machinery
关键词
P3软件
建设管理方
进度规划
WBS编码
工程阶段代码
工程项目一览表
项目平衡表
primavera project planner software
construction manager
schedule program
WBS code
project phase code
general view table of project item
item balance table