火力发电厂建设管理单位P3总进度计划编制 被引量:1

P3 Overall Schedule Chart of Fossil-fuel Power Plant Projects
下载PDF
导出
摘要 在火力发电厂建设过程中,有建设管理方(业主或业主委托的职业建设管理单位)、施工单位、调试单位等。不同的参建单位,编制工程进度的依据与范围都会不同,进度计划的详细程度、范围和级别等各方面也会有所不同,其中建设管理单位的总进度计划起着纲领性的作用。本文探讨如何运用P3软件编制出一个完善的火电工程实施阶段工程的总进度计划。 In the period of the construction process of a fossil-fuel power plant project,there are many companies joining it,such as construction manager company (owner or professional construction manager company authorized by owner),erection company ,testing company ,etc. For different companies ,the basis and the scope of the schedule are different. There are differences of the construction schedule in the detail, in the scope, in the level and in the other sides. The overall schedule chart of the construction manger is the most important leading plan of a project. Here well give a sample and a businesslike method to show how the construction manager uses the primavera project planner software to make a perfect overall schedule chart for a fossil-fuel power plant project.
作者 张森
出处 《制冷空调与电力机械》 2008年第3期94-99,共6页 Refrigeration Air Conditioning & Electric Power Machinery
关键词 P3软件 建设管理方 进度规划 WBS编码 工程阶段代码 工程项目一览表 项目平衡表 primavera project planner software construction manager schedule program WBS code project phase code general view table of project item item balance table
  • 相关文献

参考文献1

  • 1包晓春,廖培林.计划编制与进度控制方法论[Z].

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部