摘要 根据土钉现场抗拔试验数据,分析了钉材、浆液龄期等因素对土钉抗拔承载力的影响,建议了合理的下层土钉开挖时间。最后通过试验土钉抗拔力反算土体与锚固体的极限粘结强度,并与规范推荐值进行了比较。 According to the in-situ test data of soil nail, the author analysed the factors that affect the pulling resistance of soil nail, such as soil nail material, serous age and other factors, and suggested a reasonable interval time between upper and lower row nail construction. Finally, the limit cohesion strength between the soil and the nail was obtained by in-situ test, and the results were also compared with those regulated by the technical specification.
作者 陆益成 薛艳
出处 《江苏地质》 2008年第2期133-136,共4页 Jiangsu Geology
关键词 土钉 原位试验 抗拔力 江苏南京 Soil nail In-situ test Pulling resistance Nanjing,Jiangsu
  • 相关文献

参考文献3

  • 1徐州中国矿大岩土工程新技术发展公司.南京金鼎湾花园Ⅱ期工程岩土工程详细勘察报告[R].2005.
  • 2JGJ120-99.建筑基坑支护技术规程[S].[S].,..
  • 3CECS96-97.基坑土钉支护技术规程[S].[S].,..

共引文献795

同被引文献46

引证文献7

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部