摘要 负荷预测和变电站规划是电网规划的基础。针对天津滨海新区的区位特点,对滨海新区典型中心商务区的负荷预测和变电站规划方法进行研究。研究成果对于滨海新区的电网建设,具有重要的指导意义,也可供国内其他类似地区的电网规划借鉴。 Load forecasting and substation planning are the base of power distribution network planning. In consideration of the characteristic of Tianjin Binhai New District, especially the feature of typical central bussiness district, this paper studies the methods of load forecasting and substation planning. The result in this paper has great significance for instructing the construction of Tianjin Binhai New District's power network and can be as a refence for the planning of other similar district's power network.
出处 《供用电》 2008年第3期18-20,共3页 Distribution & Utilization
关键词 中心商务区 负荷预测 变电站规划 central business District load forecasting substation planning
  • 相关文献

参考文献3

  • 1M. W. Sweeney. Geographic Information Systems [J]. Water Environment Research, Vol. 70, No. 4, 1998,424-427.
  • 2余贻鑫,张弘鹏,张崇见,严雪飞.空间电力负荷预测小区用地分析的模糊推理新方法[J].天津大学学报(自然科学与工程技术版),2002,35(2):135-139. 被引量:14
  • 3H. L. Willis, James E. D. spacial electric load foracasting[J]. Tutrial Review of IEEE, Vol. 71, N. 2, 232-253.

二级参考文献2

共引文献13

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部