大跨度部分斜拉桥上部结构施工技术 被引量:3

Super Structure Construction Techniques for Large-Span Partially Cable-Stayed Bridge
下载PDF
导出
摘要 荷麻溪特大桥主梁特大型0号块采用贝雷架作支架、水平分三层浇筑等施工技术,采用超宽三角斜拉式后支点挂篮现浇部分斜拉桥大型箱梁施工技术,以及斜拉索采用环氧涂层钢绞线成品索,工厂加工成品,现场整束安装整束悬浮式张拉技术。 Hemaxi Extra-Large Bridge is a prestress concrete partially cable-stayed bridge with the longest span in our country. The keys and difficulties of super structure construction are : ( 1 ) oversized 0# piece of the main beam adopting the construction techniques of Bailey frame being the bracket, three-layer placement ; (2) adopting the partially cable-stayed bridges' large box beam of super-wide triangle oblique-pulling back supporting point hanging basket to cast-in-situ. (3) adopting epoxy resin coated steel strand finished product cable. The cable was made in workshop, installed and suspension tensioned on site.
作者 朱伟
出处 《铁道建筑技术》 2008年第3期20-26,共7页 Railway Construction Technology
关键词 部分斜拉桥挂篮施工成品索安装 partially cable-stayed bridges 0# piece cast-in-situ construction of hanging basket finished product cable
  • 相关文献

参考文献1

  • 1JTJ041-2000.公路桥涵施工技术规范[S].[S].,..

共引文献1724

同被引文献13

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部