地铁车站预留下穿围护的技术措施及风险控制

Technique and Risk Control of Reserved Underneath Bracing in Subway Station
下载PDF
导出
摘要 为满足地铁车站预留下穿的需要,并保证先建车站预留下穿范围段的围护安全,在上海轨道交通某车站主体穿越区范围采取的加长连续墙、使用玻璃纤维钢筋、桩基托换等多项具体措施。并对现场监测发现的实际开挖变形异常加以说明,同时就应急方案和风险成因进行了细致分析,为类似工程提供了有益参考。 In order to satisfy the demand of station reserved underneath passing space, and ensure the safety of pre-constructed station pit bracing structure, many specific measurements are adopted ih the subway station in Shanghai, according to the engineering geological conditions and the design requirement. Measurements include lengthening the continuous walls, using fiberglass reinforcement and piled foundation underpinning etc.. Then, the abnormal deformation obtained from the field monitoring is discussed during excavation. The emergency scheme and the risk causes are analyzed in detail, which provides useful refer- ence for similar projects.
作者 安危
出处 《土工基础》 2008年第3期11-13,共3页 Soil Engineering and Foundation
关键词 地铁车站 隧道下穿条件 风险成因 subway station, tunnel underneath passing condition, risk cause
  • 相关文献

参考文献6

二级参考文献17

  • 1桩基工程手册编写委员会,桩基工程手册,1995年
  • 2叶书麟,基础托换技术,1991年
  • 3地基处理手册编写委员会,地基处理手册,1988年
  • 4DBJ15 - 3 - 91 广东省建筑地基基础设计规范
  • 5陈肇元.土建结构工程的安全性与耐久性[Z].,2003..
  • 6ACI Committee 440.State-of-the-art report on fiber reinforced plastic (FRP) reinforcement for concrete structures[R].1996.
  • 7GB/T13096.1-91.拉挤玻璃纤维增强塑料杆力学性能试验方法[S].[S].,..
  • 8ACI Committee 440.Guide for the design and construction of concrete reinforced with FRP bars[M].MI:American Concrete Institute,2003.
  • 9Larralde Jand Silva-Rodriguez R.Bond and slip of FRP rebars in concrete[J].J of Mat in Civil Eng,1993,5(1):30-40.
  • 10Tepfers R,Hedlund G and Rosinski B.Pull-out and tensile reinforcement splice test with GFRP bars[R].Tech Report,Div of Building Technology,Chalmers Univ of Technology,Sweden,1997.

共引文献73

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部