隧道开挖数值模拟过程中荷载释放率的确定 被引量:4

Determination of Load Releasing Rate During Numerical Simulation of Tunnel Excavation
下载PDF
导出
摘要 依据围岩开挖和岩土力学原理,通过ANSYS软件对围岩级别较低的Ⅳ、Ⅴ级围岩开挖全过程进行三维有限元数值模拟,取开挖荷载释放率与其位移释放率相同,分别得出了这两种围岩中某一断面在开挖过程中各施工步的荷载释放率。并验证了Ⅳ、Ⅴ级围岩中开挖荷载释放率的正确性。 According to the principle of excavation and geotechnical mechanics, the 3D model is used to simulate the.whole process of tunnel excavation in the Ⅳand Ⅴ type of the adjacent rock by using the software ANSYS. For two different types of the adjacent rocks, the load releasing rate of the construction sequence of the cross section is got during the excavation on the condition that the load releasing rate is regarded as the same as related displacement releasing rate. Then its correctness is proved.
作者 李小红
出处 《土工基础》 2008年第3期66-69,共4页 Soil Engineering and Foundation
关键词 隧道及地下工程 荷载释放率 位移释放率 围岩开挖 数值模拟 tunnel and undergroud engineering, load releasing rate, displacement releasing rate, excavation of adjacent rock,numerical simulation
  • 相关文献

参考文献2

  • 1周顺华.开挖理论[M].北京:中国铁道出版社,1999
  • 2孙钧.地下结构有限元解析[M].上海:同济大学出版社,1988.38-39.

共引文献18

同被引文献22

引证文献4

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部