摘要 阐述了荣地水电站发电引水隧洞围岩岩体的岩性、岩石强度、结构面产状与状态以及地下水特征,依据规范对围岩进行分类,把初设成果与开挖结果进行对比,指出存在问题,提出建议,为类似工程提供经验。 An introduction was made on the lithology, rock strength, structural plane occurrence and state of the rockmass surrounding diversion tunnel of Rongdi Upgrade Project. The features of underwater are also presented. The surrounding rockmass is classified in accordance with specifications. Based on a comparison between the preliminary design achievements and the excavation exposure, the author presented the existing problems and put forward suggestions to provide engineering reference for similar project.
作者 黄泽安
出处 《广西水利水电》 2008年第3期16-18,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 总评分法 隧洞 围岩分类 荣地水电站 Overall graded method tunnel classification of surrounding rockrnass Rongdi Hydropower Plant
  • 相关文献

参考文献3

  • 1GB50287—99.水利水电工程地质勘察规范[S].[S].,..
  • 2GB50218—94.工程岩体分级标准[S].[S].,..
  • 3广西水利电力勘测设计研究院.融水县都朗河荣地水电站增机扩容初设报告(地质部分)[R].南宁:广西水利电力勘测设计研究院,2005.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部