摘要
主要描述蓬莱19-3Ⅱ期海上油田组块及导管架结构建造的质量管理与控制,详细介绍了该项目的资料管理,焊工、焊接检验员资质的特殊要求及建造过程中各工序的质量管理与控制要点。
This paper mainly describes the steel structural fabrication quality management and control of Topside Module and Jacket for Penglai19-3 phase II Offshore Oilfield. It introduces the special requirements of information management welder and welding inspector qualification, as well as the key control points of quality management and control in the process of the fabrication.
出处
《中国海洋平台》
2008年第3期45-49,共5页
China offshore Platform
关键词
资料管理
质量控制
焊接监控
检验比例
无损检验
information management
quality control
welding monitor
inspection scope
NDT