摘要
本文针对多泵多塔多节点的供水系统,给出用迭代计算确定水泵工况的计算方法,并给出在电子计算机上实现上述计算的程序的步骤。
In this paper the calculation method and steps of the computer program were expounded, which calculate pumps working-point with interative method, according to the supplying water system with more pumps, more towers and more nodes.
出处
《河北农业大学学报》
CAS
CSCD
北大核心
1990年第3期79-84,共6页
Journal of Hebei Agricultural University
关键词
供水系统
工况点
程序设计
Pumps working-point
Supplying water system
Computer program designing