以阜新县南卧线公官营子大桥桥位设计为例,分析、探讨了桥位选择、水文计算及桥孔净长在确定时应注意的一些问题。
As example with design of bridge site of Gongguanyingzi Bridge,the paper analyzes and researches some issues which the attention should be paid to at the time when selecting the bridge site, calculating the hydrology and determining the clear length of bridge opening.
出处
《北方交通》
2008年第6期109-111,共3页
Northern Communications
关键词
桥位选择
水文计算
桥孔净长的确定
Slelection of bridge position
Calculation of hydrology
Determination of clear length of bridge opening