基于面向负荷的生产控制的交货期设置方法 被引量:9

Due date assignment method based on load-oriented manufacturing control technique
下载PDF
导出
摘要 为将面向负荷的生产控制技术应用于订货生产企业,提出了一种基于面向负荷的生产控制技术的交货期设置方法。该方法是基于能力计划安排的交货期设置方法,它考虑面向负荷的生产控制机制对订单加工进程的影响,根据到达订单的加工负荷和生产系统的生产能力,确定订单的可能投放时间,从而得到订单的交货期。同时,为了配合该方法生成的计划,对面向负荷的生产控制机制和机器优先派工规则进行了相应调整。仿真实验证实了该方法的有效性,实验结果表明在含有面向负荷的生产控制的情况下,该方法的表现明显优于传统的总工作量法。另外,实验结论认为,面向负荷的生产控制技术有利于提高交货期预测的准确性,但交货期设置方法应与面向负荷的生产控制机制相适应才能实现这种优势。 To facilitate the application of Load-Oriented Manufacturing Control (LOMC) technique to Make-to-Order (MTO) companies, a due date assignment method was proposed, which was called LOMC-based Due Date Assignment (LDDA). As a capacity-driven approach, LDDA considered the influence exerted by LOMC mechanism and determined the possible release date of a coming order, according to the workload information of the order and current available capacity of the manufacturing system. Therefore, the due date of the order could be obtained. Mean- while, LOMC mechanism and the dispatching rule were adjusted to'comply with the plan arranged by LDDA. Finally, simulation experiments were carried out to confirm the effectiveness of LDDA. Experimental results showed that LDDA outperformed Total Work Content (TWK) method remarkably when LOMC was applied. In addition, it was concluded that the application of LOMC could contribute to due date reliability; while delivery performance also depended on whether the due date assignment method was fit for LOMC mechanism.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2008年第6期1200-1205,1212,共7页 Computer Integrated Manufacturing Systems
关键词 交货期设置 订货生产 订单检查与投放 面向负荷的生产控制 due date assignment make-to-order order review and release load-oriented manufacturing control
  • 相关文献

参考文献12

  • 1PARK C, SONG J, KIM J G, et. al. Delivery date decision support system for the large scale make-to-order manufacturing companies: a Korean electric motor company case[J]. Production Planning and Control, 1999, 10(6): 585-597.
  • 2BERGAMASCHI D, CIGOLINI R, PERONA M, et al. Order review and release strategies in a Job Shop environment., a review and a classification [J]. International Journal of Production Research, 1997, 35(2): 399-420.
  • 3SABUNCUOGLU I, COMLEKCI A. Operation-based flow- time estimation in a dynamie Job Shop[J]. Omega, 2002, 30 (6) :423-442.
  • 4MOSES S, GRANT H, GRUENWALD L, et. al. Real-time due-date promising by build-to-order environments[J]. International Journal of Production Research, 2004, 42(20) : 4353- 4375.
  • 5STEVENSON M, HENDRY L C. Aggregate load-oriented workload control., a review and a re-classification of a key approach [J]. International Journal of Production Economics, 2006, 104(2): 676-693.
  • 6WEIN L M, CHEVALIER P B. A broader view of the Job- Shop scheduling problem [J]. Management Science, 1992, 38 (7) : 1018-1033.
  • 7BECHTE W. Theory and practice of load-oriented manufacturing control [J]. International Journal of Production Research, 1988,26(3) :375-395.
  • 8维茵达尔H.-P.面向负荷的生产控制:理论基础,方法与实践[M].肖田元,范玉顺,姚小冬,译.北京:清华大学出版社,1999.
  • 9LAND M. Parameters and sensitivity in workload control [J]. International Journal of Production Economics, 2006, 104(2) : 625-638.
  • 10PERONA M, PORTIOLI A. The impact of parameters setting in load oriented manufacturing control[J]. International Journal of Production Economics, 1998, 55(2): 133-142.

同被引文献87

引证文献9

二级引证文献32

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部