200MW火力发电机组仿真机DCS改造 被引量:1

DCS Simulator Reforming for 200 MW Power Plant Unit
下载PDF
导出
摘要 由于DCS在火电厂的广泛应用,火力发电机组的运行方式发生了巨大的变化,使得以前基于仪表盘台的火力发电机组培训仿真机不再适合人员培训的需要。对重庆市电力局电力教育培训中心的200MW火力发电机组培训仿真机的软件系统进行更新,并改造电气盘台的硬件系统,完成了盘台和DCS并行工作的新型仿真机的改造。在长时间测试和使用中,整个机组硬件工作稳定,模型能够反映系统主要的动态特性,通讯可靠,改造达到了预期的目标。 Because DCS is widely used in electric power plant and the operating methods have been changed, the simulator based on instruments and dial plates can not meet the needs of training. In this paper, the basic idea of the reforming process for the 200 MW simulator in Electric Training Center of Chongqing is presented. In order to complete a new typical simulator with the characters of DCS and instruments, all the softwares have been modified, and the hardware in electric panel has been renewed. After reforming, many experimentations are adopted to test the simulator, and the results of test and long time training process show that it is accurate and usable.
出处 《重庆电力高等专科学校学报》 2008年第2期1-4,8,共5页 Journal of Chongqing Electric Power College
关键词 火电机组 仿真 培训 改造 power plant unit simulation training reforming
  • 相关文献

参考文献2

二级参考文献3

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部