摘要
叙述了山东梁宝寺矿井主井井筒施工中,利用永久箱形结构井架布置凿井设施,充分利用时间和空间,围绕井架安装,实现了凿井设施的合理布置,同时在施工中采取有效的技术措施保证施工的安全。
This paper introduces how to reasonably arrange sinking equipment, use time and space and build arround pit frame by using permanent box - shape fracture in the construction of main shaft of Shangdong Liangbaosi Coal Mine at the same time apply available measures to insure safe construction.
出处
《煤炭技术》
CAS
2008年第3期112-114,共3页
Coal Technology
关键词
永久井架
主井井筒
凿井设施
技术措施
permanent pit frame
main well shaft
equipment of shaft sinking
technical measures