摘要
介绍了建筑工程施工工序质量控制的两个方面,提出了当前建筑工程施工工序质量控制的要点,分析了影响建筑工程施工工序质量的主要因素,详细地阐述了加强建筑工程施工工序质量控制的对策,从而实现工程的最优化。
The author introduces two aspects of the quality control of the architecture construction working procedure, puts forward the main points of the quality control of the architecture construction working procedure in present, analyzes the main influencing factors of the quality of the architecture construction working procedure, detailedly describes the countermeasure of strengthening the quality control of the architecture construction working procedure, to realize the optimization of the engineering.
出处
《山西建筑》
2008年第19期218-219,共2页
Shanxi Architecture
关键词
建筑工程
工序
质量控制
主要因素
construction engineering, process, quality control, main factors