期刊文献+

基于双重变换器的变速风力发电机组最大功率点快速追踪系统

A Maximum Power Point Fast Tracking System of Variable Speed Windturbine Using a Double Sepic Convertor
下载PDF
导出
摘要 针对变速风力发电系统提出了一个新的最大功率点(MPP)快速追踪策略。该系统采用AC-DC-DC-AC变换器将永磁电机发出的电能传输给电网。鉴于DC-DC直流环节在能量传输中的重要性,采用了双重Sepic变换器,并进行了详细分析。仿真结果证明了该控制策略及变流系统的正确性和可行性。 A novel maximum power point fast tracking strategy in a variable speed wind turbine system is presented, which utilizes the AC-DC-DC-AC power converter to deliver the power energy from permanent magnet generator to the grid. Furthermore,as the important section of DC link to deliver power of energy in the converter system, a double Sepic converter is proposed and specifically analyzed. Analysis and simulation results confirm the validity and feasibility of the strategy and wind turbine system.
机构地区 江南大学
出处 《电机与控制应用》 北大核心 2008年第6期60-64,共5页 Electric machines & control application
关键词 变速风力机 永磁电机 最大功率点 variable speed wind turbine permanent magnet generator maximum power point
  • 相关文献

参考文献4

  • 1邓禹,邹旭东,康勇,陈坚.变速恒频双馈风力发电系统最优风能捕获控制[J].通信电源技术,2005,22(3):21-24. 被引量:24
  • 2Muljadi E, Drouilhet S, Holz R, et al. Analysis of permanent magnet generator for wind power battery eharging [C ] // IEEE Ind Applications Conference,1996:541-548.
  • 3Eftichios Koutroulis, Kostas Kalaitzakis. Design of a maximum power tracking system for wind-energy-conversion applications [ C ]// IEEE Tran on Ind Electronics, 2006 (2) :486-494.
  • 4Zinger D S, Muljadi E. Annualized wind energy improvement using variable speeds [ C ]//IEEE Trans Ind Applicat, 1997 ( 11 ) :1444-1447.

二级参考文献7

共引文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部