摘要
地震对什么考验最大?答案是建筑行业。因为重大人员伤亡的主要原因在于建筑物的倒塌。
The Sichuan earthquake has created a testing time for the construction industry. Building structure is the key factor in the seismic capacity of buildings. Therefore the brick masonry and prefabricated floor building structure should be gradually reduced in the application to the low-rise and multi-floor public buildings. The frame structure should be energetically popularized.
出处
《走向世界》
2008年第11期94-95,共2页
Openings