期刊文献+

水布垭面板堆石坝安全监测分析 被引量:1

Analysis on Safety Monitoring of the Shuibuya Concrete Face Rockfill Dam
下载PDF
导出
摘要 水布垭混凝土面板堆石坝最大坝高233 m,坝体原型安全仪器监测数据是反映工程实体质量在施工期及运行期的工作状态的最直接的参数。根据目前已有的监测资料成果分析,相应的监测设施布置合理,监测数据真实可靠,为分析判断工程运行工况和实体质量提供了客观依据。 Shuibuya CFRD maximum height of 233 m, dam safety equipment prototype monitoring data entity is a reflection of the quality of the construction period and with the work of running the most direct state parameters. According to the current information has been monitoring the results of the corresponding monitoring facilities are reasonable, the authenticity and reliability of monitoring data for the analysis and judgement of operating conditions and the quality of entities provide an objective basis.
作者 王怀军 周鹏
出处 《黑龙江水专学报》 2008年第2期47-49,共3页 Journal of Heilongjiang Hydraulic Engineering College
关键词 面板堆石坝 安全监测 水布垭 concrete face rockfill dam safety monitoring Shuibuya
  • 相关文献

参考文献3

  • 1武汉大学测绘学院测量平差教研室.测量平差基础[M].北京:测绘出版社,2004.
  • 2DL/T 5173-2003,水利水电施工测量规范[S].
  • 3中国葛洲坝坝集团股份有限公司.水布垭混凝土面板堆石坝施工工法[Z].宜昌:中国葛洲坝集团股份有限公司,2007.

共引文献2

同被引文献1

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部