摘要
介绍了柳钢1号高炉喷煤系统进行浓相输送喷吹煤所需的技术改造措施,并评价其对高炉生产的影响。
The technical reformation plans and countermeasures needed by pulverized coal injection with dense phase transport for No.1 Blast Furnace were introduced, and its effects for Blast Furnace production were evaluated.
关键词
高炉
喷煤
浓相输送
Blast Furnace Pulverized Coal Injection Dense Phase Transport