摘要
运用FLAC3D软件,对百善煤矿6123首采工作面开采所引起的南沱河河堤的移动与变形(以南堤为例)进行了模拟,与实测对比分析,得出了地表移动的基本规律和特征。模拟结果对堤下采煤具有一定的指导意义,为开采沉陷的堤坝治理提供了科学依据。
Movement and deformation of Nantuo River bank (taking the south bank as example) caused by the first mining longwall 6123 in Baishan Mine was simulated by FLAC^3D. Comparing the simulation results with in-situ survey, the basic characteristics and behavior of the earth's surface movement were educed. The results have some guidance in mining under the river bank and provide scientific basis for the river bank subsidence treatment.
出处
《安徽理工大学学报(自然科学版)》
CAS
2008年第2期6-10,共5页
Journal of Anhui University of Science and Technology:Natural Science
关键词
FLAC
沉陷
数值模拟
FLAC
subsidence
numerical simulation