摘要
介绍了洛湛铁路永洪段DIK137+700~DIK138+000段的地貌及工程概况,详细叙述了洛湛铁路永洪段DIK137+700~DIK138+000段的强夯处理方案和施工工艺。
This paper introduces the landform and general situation of DIK137+700-DIK138+000 segment, Yonghong section in Luozhan Railway, and expounds the dynamic consolidation scheme and construction technology of DIK137+700- DIK138+000 segment, Yonghong section in Luozhan Railway.
出处
《科技情报开发与经济》
2008年第18期224-225,共2页
Sci-Tech Information Development & Economy
关键词
洛湛铁路工程
煤矿采空区地基
强夯法
路基加固
Luozhan Railway Project
foundation of Goaf area of coal mine
dynamic consolidation
roadbed reinforcement