成都华昌综合楼爆破拆除

BLASTING DEMOLITION OF HUACHANG MULTIPURPOSE BUILDINGS IN CHENGDU
下载PDF
导出
摘要 采用控制爆破技术拆除了L型框架结构综合楼。由于环境限制,必须控制后坐、塌落振动、飞石及空气冲击波。采取了多切口定向倒塌的爆破设计方案,合理确定炸高,并利用前、后排承重柱以及上、下切口的起爆时差,同时辅以先切梁、后断柱的措施,取得了非常理想的爆破效果。 The paper introduced a practical example of successful demolition of Huachang Multipurpose Buildings in L-shape frame structure in Chengdu by controlled blasting. Restricted by the surroundings, the backlash,collapsing vibrations,blasting slungshot and shock wave must be controlled. The design adopted the schemes of multi-cuts and directional collapse. Through determining suitable stand-off,making a better use of the detonating time differences of the front and rear pillars as well as top and blow cuts, and meanwhile, using additional beam cutting and pillar breaking, excellent blasting results of the directional folding collapse and controlled heap distances were obtained. The blasting reached very ideal result and verified the technologies designed in this project.
出处 《工程爆破》 2008年第2期48-51,共4页 Engineering Blasting
关键词 爆破拆除 “L”型楼房 框架结构 延时起爆 Blasting demolition L-type building Frame structure Delay ignition
  • 相关文献

参考文献3

二级参考文献6

  • 1李守巨.拆除爆破中的安全防护技术[J].工程爆破,1995,1(1):71-75. 被引量:78
  • 2Hoek E,Bray J W.Rock Engineering[M],1981.
  • 3齐世福 龙源.[D].南京:中国人民解放军理工大学,2002.
  • 4王希之,爆破,1998年,4期,68页
  • 5冯叔瑜,城市控制爆破,1996年
  • 6齐世福 龙源.军事爆破工程设计与应用[M].南京:中国人民解放军理工大学,2002..

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部