摘要
建立了异步发电机的稳态数学模型,表明风电穿透功率极限是系统的网络结构、风电并网节点位置、负荷水平、机组的最小出力限制、系统对电压水平的要求、风电场无功补偿容量等因素综合作用的结果,制约系统风电穿透功率水平的主要原因是风电功率注入引起的节点电压越限。
This paper establish a steady-state asynchronous generators mathematical model, showed that wind power is the ultimate power through the network structure, wind power and network node location, load level, the smallest unit of output restrictions, the voltage level of system requirements , Wind farm capacity of reactive power compensation factors such as power penetration level of wind power is the main cause of the result of restricting power system wind the node into the voltage limit.
出处
《商品储运与养护》
2008年第5期104-105,共2页
Storage Transportation & Preservation of Commodities
关键词
风电穿透功率极限
异步发电机
潮流计算
wind power penetration limit
asynchronous generator
flow calculation