以福建省莆田市延寿大厦的桩基工程为实例,介绍了PHC管桩的施工方法,分析了施工过程中出现的异常情况,并提出相应的处理措施。
Through the example of the pile engineering of Yanshou big building in Putian City of Fujian Province, the major construction method of PHC pipe pile is introduced, the abnormal situations in the construction are analyzed, and the corresponding measures are put forward.