3Steinberg M J,Smith T H.Economic Loading of Steam Power Plants and Electric Systems[M].New York:John Wiley and Sons Inc,1943.
4GRIGG C, WONG P, ALBRECHT P, et al. The IEEE reliability test system-1996: a report prepared by the Reliability Test System Task Force of the Application of Probability Methods Subcommittee. IEEE Trans on Power Systems, 1999, 14(3): 1010-1020.