摘要
对横管初冷器洗萘工艺存在的问题进行了分析,提出了相应的改进措施。通过增大循环洗液焦油补充量和将上、下段喷洒管进行位置交换等关键措施,确保了生产的顺行。
Against the existing problem in the spraying system of cross - tube primary cooler, the respective modification measure has been taken, the cooling effect and safe delivery of gans were ensured.
出处
《河南冶金》
2008年第3期25-27,共3页
Henan Metallurgy
关键词
横管初冷器
冷凝液
改进措施
Cross -tube Primary Cooler Tar improvement Measure