摘要
在钱塘江强涌潮区修筑桩式丁坝是对传统抛石丁坝的一次重要革新,但其施工却面临着恶劣的自然条件,施工技术缺少现成的经验.参建各方大胆创新、积极投入,终于攻克了一系列技术难关,确保工程保质保量、顺利完工.
It proves to be an important innovation to replace the traditional riprap spur dike with the pile spur dike in the areas of strong tidal area of Qiantang River, but the construction is facing the worst natural conditions and the lack of technical experience in dealing with. The constrctures make bold innovations and finally overcome a series of technical difficulties to ensure the quality, the volume and the smooth completion.
出处
《浙江水利水电专科学校学报》
2008年第2期18-20,共3页
Journal of Zhejiang Water Conservancy and Hydropower College
关键词
钱塘江海塘
传统抛石丁坝
桩式丁坝
施工技术
Qiantang River levee
traditional riprap spur dike
pile spur dike
construction technology