白沙湾至水口围涂工程施工难点与对策

Construction of Beach Reclamation Project from Baishawan to Shuikou
下载PDF
导出
摘要 平湖市白沙湾至水口治江围涂工程是浙江省第一个以管袋土方结合护面结构型式的围垦工程。通过二年半时间的建设,目前本工程已完成主堤工程建设.对建设过程中碰到的难点进行了总结,同时针对工程的难点采取了一系列对策,并取得了成功.主要包括以下几个环节:主堤底层管袋、排水板插打、合龙、削坡施工、原型观测设施保护等. Pinghu Beach Reclamation Project from Baishawan to Shuikou is the first one carried out by the combination of piping package earthwork and pavement structure, the main part of which has been finished after 2 years' construction. A series of resolutions to the project difficulties in the constructing process are sumarrized, including foundation piping package in the main dyke, drainage beard inserting, dyke closure, scaling construction and so on, which is useful for the similar projects.
出处 《浙江水利水电专科学校学报》 2008年第2期24-26,共3页 Journal of Zhejiang Water Conservancy and Hydropower College
关键词 平湖围涂工程 管袋土方 施工难点 Pinghu Beach Reclamation Project piping package earthwork construction difficulty
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部