摘要 通过2月1日220kV东干Ⅰ回的事故分析,发现四方公司CSL100系列保护(软件版本V3.54G)在开关接点发生抖动时,保护逻辑不完善,导致保护不正确动作。
作者 张晓冬
出处 《贵州电力技术》 2008年第6期50-51,共2页 Guizhou Electric Power Technology
  • 相关文献

同被引文献9

  • 1ZEINELDIN H H. Optimal coordination of microprocessor based directional overcurrent relay// Proceedings of Canadian Conference on Electrical and Computer Engineering, May 4-7, 2008, Niagara Falls, Canada.
  • 2TAN J C, MCLAREN P G, JAYASINGHE R P, et al. Software model for inverse time overcurrent relays incorporating IEC and IEEE standard curves// Proceedings of Canadian Conference on Electrical and Computer Engineering: Vol 1,May 12-15, 2002, Winnipeg, Canada: 37-41.
  • 3贺家李,宋从矩.电力系统继电保护原理.增订版.北京:中国电力出版社,2007.
  • 4HENVILLE C F. Combined use of definite and inverse time overcurrent elements assists in transmission line ground relay coordination. IEEE Trans on Power Delivery, 1993, 8 (3) : 925-932.
  • 5IEC Publication 255-3 (1989-05) Single input energizing quantity measuring relays with dependent or independent time. 2nd ed.
  • 6DL/T 684-1999 大型发电机变压器继电保护整定计算导则.1999.
  • 7严琪,肖万芳.反时限电流保护整定计算相关问题研究[J].电力自动化设备,2008,28(7):77-80. 被引量:26
  • 8宋斌.具有不同特性的微机反时限过流继电器的实现[J].电力系统自动化,2001,25(17):57-59. 被引量:28
  • 9黄彦全,肖建,蔡勇,李晋,唐磊.新型微机反时限电流保护时间-电流特性的工程应用[J].电力系统自动化,2003,27(23):71-73. 被引量:25

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部