深埋隧洞突发性高压涌水预测及对策研究 被引量:1

Prediction and Countermeasures for Paroxysmal High-Pressure Blow of Deeply Buried Tunnels
下载PDF
导出
摘要 文中介绍了几种典型高压涌水形成的地质条件,为了防止在隧洞掘进过程中出现突发性高压涌水,采用宏观地质预报、微观地质预报及探地雷达预报提前预测可能存在高压涌水的位置、水量和水压等,并且对一些富含高压水构造提出了一些相应的施工对策。 Geology conditions of typical high pressure blows were described in this paper, and it' s very significant for paroxysmal high - pressure blow forecasting in the process of tunnel drivaging. The position, water quantity and pres- sure of high - pressure blow can be predicted with technologies of geology macro - and micro - forecast and ground penetrating radar (GPR). As a conclusion, construction countermeasures were also brought forward for structures of high - pressure water.
出处 《浙江交通职业技术学院学报》 CAS 2008年第2期22-25,共4页 Journal of Zhejiang Institute of Communications
关键词 高压涌水 地质预报 探地雷达 施工对策 high - pressure blow geology forecast ground penetrating radar (GPR) construction countermeasure
  • 相关文献

参考文献4

二级参考文献2

共引文献61

同被引文献4

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部