隧道超浅埋段暗挖施工控制技术

Construction Control Techniques of Underground Excavation for Super-shallow Buried Tunnel
下载PDF
导出
摘要 以商界高速公路何家园隧道为工程实例,介绍了覆土只有2.8~5m、地层为松散、破碎、强风化软弱围岩的山间暗挖隧道的施工方法,以及如何控制地表沉降、加强支护和爆破施工等关键技术。 Taking the project of Hejiayuan Tunnel in Shangjie Highway, this paper described the constructing method for underground excavation in mountainous tunnels, whose sheltered earth was only 2. 8 to 5 meters and stratum was incompact, fragmentized, highly weathered, and in weak rock region. Such techniques as how to control ground surface subsidence, timbering enhancing, and blasting construction were introduced.
作者 陈新焕
出处 《交通与计算机》 2008年第3期130-132,共3页 Computer and Communications
关键词 超浅埋隧道 暗挖法 地表沉降 控制爆破 super-shallow buried tunnel underground excavation method ground surface subsidence controlling blasting
  • 相关文献

参考文献4

  • 1中华人民共和国交通部.JTGDT0-2004公路隧道设计规范[S].北京:人民交通出版社,2004
  • 2Eisenstein Z, Ezzeldine O. The effect of tunneling on ground control[J]. Tunnelling and underground space technology, 1992,7(3) : 273-279
  • 3中华人民共和国交通部.JTJ042-94公路隧道施工技术规范[S].北京:人民交通出版社,1995..
  • 4徐军,郑颖人.隧道围岩弹塑性随机有限元分析及可靠度计算[J].岩土力学,2003,24(1):70-74. 被引量:28

二级参考文献3

共引文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部