摘要
介绍变电站综合自动化系统的技术要求,对系统的调试工作进行研究和总结,并提出系统调试中需要注意的问题,可为同类系统的调试工作提供参考。
The technique requests of the system are introduced,and the commissioning test are studied and summarized to advance the observing problems during commissioning,in order to be a take reference for same kinds systems during commissioning test.