本文建立了不确定资源环境下的资源受限的项目调度模型,用不确定规划的方法将不确定问题转化为等价的确定性问题,并给出了一个解决该问题的二阶段算法及实例。
In this paper, a model of project scheduling with uncertain resource constraints is constructed. The original uncertain problem is converted into an equivalent deterministic programming problem by the chance-constrained programming method. A simple two-stage method is proposed and an example is also presented