期刊文献+

大同市地下水资源枯竭过程研究

Research on the Exhaustion Procedure of Datong City's Groundwater Resources
下载PDF
导出
摘要 地下水资源是北方城市的主要供给水源,为了满足其需水的要求,连年超采地下水,导致地下水位不断下降,地下水资源面临枯竭。文中依据国家煤电基地大同市水资源开发利用现状,对其地下水资源的枯竭过程进行了研究,并进行了大同市地下水资源的枯竭预测。 Groundwater resources are the main water resources of supply for the northen cities of China. In order to meet the request of water, the overdraft of groundwater resources has to be done. This result lead to the continuous draw-down of groundwater level,and the groundwater resources are next to exhaustion, In this paper,based on the current situation of the exploration of water resources in Datong City which is one of the bases of coal electricity of the whole nation,the research on the exhaustion of groundwater resources has been carried out. Finally the predict for the exhaustion of Datong City's groundwater resources has been done.
作者 杨平
出处 《山西水利科技》 2008年第3期19-20,共2页 Shanxi Hydrotechnics
关键词 地下水 超采 枯竭 groundwater overdraft exhaustion
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部