摘要
结合合武铁路客运专线石婆店梁厂施工实例,介绍了大体积箱梁混凝土冬季浇筑时蒸汽养护的工艺及施工要点。
This paper, combined with the construction practice of the Passenger Dedicated Line of He Wu railway at Shipodian roof beam factory, introduces the techniques for the stream maintenance of the large volume case roof beam' s concrete when poured and constructed in winter as well as the key points of construction.
出处
《铁道建筑技术》
2008年第4期29-31,共3页
Railway Construction Technology
关键词
大体积箱梁
蒸汽养护
施工技术
操作要点
large volume case roof beam
the maintenance of steam
construction skills
key points of operation