岩土结合地质条件下深基坑工程施工技术 被引量:11

Construction Technology of Deep Foundation Pit Under Rock-Soil Combinational Geological Condition
下载PDF
导出
摘要 针对局促的场地条件及近于垂直开挖的需要,超深基坑上部的砂土层采用桩锚围护技术,下部的基岩层采用锚喷的支护技术,在岩土结合面处的坡面上设置了锚板墙来加强支护桩桩脚的嵌固.通过现场爆破试爆取得科学的、安全的技术参数,采用分层毫秒微差延时爆破技术结合局部静力破碎技术减轻爆破时的振动.工程实践证明,基坑支护体系得到了有效保护. Considering the situation of straitness field and approximately vertically excavation, pile-anchor protection technique is applied in the upper sand layer of ultra-deep foundation pit, the shotcrete and rock bolt technique is employed in the bottom bedrock layer. In the slope of soil-rock combine surface, the anchor plate wall is set up to, strengthen the inlay firm of support pile foot. According to the technical safe parameters which are observed from field testing explosion, the combination of divide layers of milliseconds elementary difference delay explosion technique and the static broken technique are employed to release the exploding vibration. Engineering practice indicates that the present construction method is able to effectively protect foundation pit support system.
出处 《青岛理工大学学报》 CAS 2008年第3期111-114,共4页 Journal of Qingdao University of Technology
关键词 深基坑 锚板墙 毫秒微差延时爆破 deep foundation pit anchor plate wall millisecond elementary difference delay explosion
  • 相关文献

参考文献4

二级参考文献5

共引文献13

同被引文献40

引证文献11

二级引证文献98

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部