期刊文献+

乌拉泊水库输水隧洞除险加固方案探讨 被引量:4

Discussion on strengthening scheme of water conveyance tunnel of Wulabe Reservoir
下载PDF
导出
摘要 乌拉泊水库是乌鲁木齐河流域治理的骨干性工程,其输水隧洞建成运行近30年存在较多的质量问题。经对输水隧洞除险加固四种方案进行比选,决定选用原混凝土全部拆除、全断面采用钢筋混凝土衬砌的较优方案。文中对该方案具体设计进行了说明,以便为类似工程提供参考。 Wulabe Reservoir is a key project for the improvement of Urumqi River Basin, of which the water conveyance tunnel has been operated for nearly 30 years and then more quality problems are there in it, After the comparison made on four alternatives of the strengthening plan for the tunnel, the scheme to remove all the original concrete and then line the full-section with reinforced concrete is determined to be adopted as a better strengthening way. The design in detail of the plan is described herein, so as to provide a reference for the similar projects concerned.
作者 王学萍
出处 《水利水电技术》 CSCD 北大核心 2008年第7期94-96,99,共4页 Water Resources and Hydropower Engineering
关键词 乌拉泊水库 输水隧洞 除险加固 Wulabe reservoir water conveyance tunnel strengthening
  • 相关文献

参考文献5

二级参考文献5

  • 1陈雄,胡志华,王谊.中小型水库可持续发展评价体系研究[J].大坝与安全,2006,20(6):32-35. 被引量:3
  • 2南京水利科学研究院勘测设计院.青海省中坝水库除险加固工程初步设计报告[R].南京:南京水利科学研究院勘测设计院,2002.
  • 3青海省水利厅.中坝水库大坝安全鉴定报告书[R].西宁:青海省水利厅,2002.
  • 4伯永年.中国堤坝防渗加固新技术[M].北京:中国水利水电出版社,2001.47-56.
  • 5钱定富,孟龙岗,潘国庆,张兴权.砼钻孔灌注桩施工中的质量控制[J].宁波大学学报(理工版),2002,15(2):79-80. 被引量:2

共引文献18

同被引文献10

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部