摘要
介绍了长治地区电网配电网中性点接地方式现状。针对城市大量电力电缆投入使用引起的系统电容电流剧增,提出工程应用中具体问题的解决方法。讨论了消弧线圈在变电站设计、改造中容量的选取、接地变压器选型、运行维护注意事项等实际问题。
Current status of neutral point grounding of Changzhi distribution network is introduced. As to the huge increase of capacitance current caused by large electric power cables being imputed, specific solutions in engineering application are proposed. Besides, actual problems in arc suppression coil in electric substation design, selection of reformed capability and grounding transformer, and matters in grounding transformer operation and maintenance are put forward.
出处
《山西电力》
2008年第3期12-14,26,共4页
Shanxi Electric Power
关键词
中性点接地方式
消弧线圈
电容电流
脱谐度
接地运行时间
neutral point grounding
arc-suppression coil
capacitance current
self-tracking compensation
grounding operation time